Name of Work | Description | Location | Status |
Electrical works in connection with Upgradation/ Modernization of Infrastructure at 11 Goods shed over SBP Division | LT electrification, high mast & street lighting, underground cabling, signage systems, HVAC integration, and substation-associated feeder infrastructure for a large-scale institutional facility. The project covered concealed building wiring, LED lighting, distribution boards, AC systems, HDPE/GI cable routing, trenchless crossings, earthing systems, and outdoor illumination with high mast towers and feeder pillars. Total Value: ₹4.75 Cr | Sambalpur, Odisha | Ongoing |
Provision of HT Aerial Bunch cable by replacing 11KV ACSR Conductor with necessary associated ancilliary work at different Railway settlement in place of existing overhead line. | Large-scale LT and 11kV HT Aerial Bunched Cable (ABC) infrastructure works including supply, erection, stringing, and commissioning across extended railway corridors. The scope also included DG backup integration and rail pole foundation works, delivering a complete overhead power distribution system with structural and auxiliary integration. Total Value: 6.28 Cr | Bokaro, Jharkhand Raghunathpur, West Bengal | Ongoing |
Conversion of 11KV & 33 KV overhead power line crossings to underground cables over South Eastern Railway using Horizontal Directional Drilling | Comprehensive 11kV and 33kV overhead and underground power infrastructure works including pole structures, ACSR stringing, XLPE cable laying, micro-tunnelling and HDD-based crossings, termination systems, and surge protection installations. The project integrated HT overhead distribution with underground cable crossings, ensuring safe, compliant, and structurally robust electrification. Total Value: ₹7.06 Cr | Dhanbad & Jamshedpur - Jharkhand Asansol & Bankura - West Bengal Kendujhar & Rourkela - Odisha | Ongoing |
Supply, installation and commissioning of high mast towers, electric poles, mini masts etc. at different yards in South Eastern Railway zone | Large-scale high mast and street lighting infrastructure including 16-20m high mast towers with 200W LED floodlighting, decorative poles, feeder pillars, timer-based lighting control panels, and extensive underground cable networks with HDD crossings. Total Value: ₹3.6 Cr | Asansol & Kharagpur - West Bengal | Near Completion |
Execution of Electrical works of Construction organization Bhubaneshwar unit, in connection with SBP-ANGL doubling works | Complete HT/LT power distribution and infrastructure package covering underground cabling, internal electrification, feeder pillars, transformer installations, and civil works. The project integrated substation augmentation, platform electrification, AC systems, lighting networks, and 11 kV protection equipment into a reliable and standards-compliant power framework. | Bhubaneshwar - Odisha | Near Completion |
Upgradation of maintenance facilities for Power Supply Arrangement with improvement of illumination in pit line, sick line, catwalk etc. at Coach care centre and Loco Sheds in Visakhapatnam of Waltair Division | The work involved large-scale under-pit and structural lighting works including 3D luminaires, step-down transformer-fed 48V lighting systems, IP65 outdoor distribution boards, feeder pillars, structured cabling, HDD crossings and cable tray networks. The project integrates protected low-voltage lighting circuits, industrial-grade distribution architecture and robust civil interfacing for high-durability railway infrastructure applications. | Vishakhapatnam - Andhra Pradesh | Near Completion |
Replacement of overhead lines with underground cable over coastal belt of Waltair Division on East Coast Railway | HT & LT distribution infrastructure including extensive horizontally drilled trenchless cable networks, feeder pillars up to 630A, 11kV AB switches, APFC systems, solar integration, and full substation civil works. Total Value: ₹3.1 Cr | Srikakulam & Vizianagram - Andhra Pradesh | Near Completion |
Provision of 33KV sectional Isolation, Tunnel illumination, 33KV standby power supply and improvement of water supply arrangement in different sections under CKP Division | The work involved 33kV HT overhead and distribution infrastructure including AB switches, D.O. fuses, lightning protection systems, gantry fabrication, ACSR conductor stringing, trench and RCC cable trench construction, LT panel integration, LED tunnel lighting, and pump house electrification. | Jamshedpur, Jharkhand Rourkela, Odisha | Completed | Closure in Progress |
Replacement of dilapidated existing LT cubical of 10 Electrical Sub-stations to improve power supply system over Waltair Division (Phase-I) | Design, fabrication and commissioning of heavy-duty indoor LT panels up to 1600A ACB incomers with bus-coupler configuration, high fault-level protection (50kA), smart metering, and IP54-rated construction. The project included large-capacity feeder pillars, multi-incomer architecture, civil foundations, dismantling and replacement of existing panels — delivering high-reliability substation-grade LT distribution systems. | Vishakhapatnam, Andhra Pradesh | Completed |
Provision of 750 Volt electric supply connecting to all pit lines for testing of HOG trains at TATA | Executed complete 11kV substation and 750V LT distribution infrastructure including 500kVA transformers, VCB panels, ACB-based LT boards, XLPE cabling, structured tray routing, switching equipment, earthing systems, and safety infrastructure. The scope covered supply, civil foundations, installation, protection systems, and full commissioning under Railway standards. | Tatanagar, Jharkhand | Completed |
Provision of 750V, 3 phase testing facility for LHB coaches at Rourkela (phase - 1) | LT feeder augmentation works including heavy-duty 4C 400/240 sqmm XLPE cable installation, trench and trenchless crossings, 11kV pole-mounted protection structures, feeder pillars, structured cable tray systems, and comprehensive earthing & safety infrastructure. | Rourkela, Odisha | Completed |
Construction of dedicated substation and Improvement of LT distribution network at MSMD station of Sambalpur Division | Execution of integrated 11kV & LT power infrastructure including outdoor feeder pillars, underground cable networks, trenchless crossings, 250 kVA transformer installation, overhead line components, substation civil works, and protection systems. The scope demonstrates capability in substation construction, HT switching systems, panel engineering, underground utilities, and complete distribution infrastructure. | Sambalpur, Odisha | Completed |
Augmentation, up-gradation & modification of power supply installations over Sambalpur division. | 33/11kV substation yard and LT distribution works including plinth and foundation construction, cable trench systems, 17,000+ metre HT/LT cable laying, feeder pillars, APFC panels, AB cable stringing, GI structural fabrication, and earthing infrastructure as per Railway standards. | Sambalpur, Odisha | Completed |
Rehabilitation of Distribution substation over Sambalpur Division | Large-scale LT panel infrastructure and 11kV substation augmentation including ACB-based main distribution panels, feeder pillars, HT switching systems, underground cable networks with trenchless crossings, and full civil development of substation yard. The project demonstrates capability in heavy-duty LT panel engineering, HT equipment installation, underground utility construction, and complete substation structural works. | Sambalpur, Odisha | Completed |
Execution of General Electrical Works in connection with doubling of Badmal(In)-sikir(In)-Titlagarh(In) section of Sambalpur-Titlagarh PKG-3 in Sambalpur Division of E.Co.Rly of Odisha, India | Executed a comprehensive HT/LT power distribution and electrification package including 11kV cable terminations, LT cable networks, feeder pillars, switchboards, earthing systems, and energy-efficient lighting installations. The scope covered underground cable routing under railway tracks, solar street lighting, structural poles, and complete testing & commissioning as per Railway specifications. Delivered an end-to-end solution from design drawings to final energization with statutory approvals, ensuring reliability, safety, and long-term performance. | Titlagarh, Odisha | Completed |
Electrical work for renovation & extension of welding facilities at freight maintenance yards of ADTP, DPS & BNDM. | 11kV–415V power distribution package for Railway infrastructure, including transformer installation, HT switching systems, LT panels, DG backup, extensive underground cabling, and high-mast lighting. Delivered complete supply, erection, testing, and commissioning in line with Railway drawings and IS standards, ensuring safe and reliable power networks. | Adityapur, Jharkhand Bondamunda, Odisha | Completed |
Improvements of pit line illumination at Coaching complex, ROURKELA. | Specialized Railway lighting and power distribution package covering under-pit illumination, LT cabling, pole works, transformers, and earthing systems. | Rourkela, Odisha | Completed |
Electrification in connection with construction of Train Management System (TMS) center at Khurda Road. | Executed a comprehensive internal electrical, power distribution, bus duct, lighting, and fire alarm installation package integrated with HT cable terminations and RMU-based power distribution. The project combined advanced distribution systems, intelligent fire detection, and energy-efficient lighting to deliver a modern, compliant, and scalable electrical infrastructure. | Bhubaneshwar, Odisha | Completed |
Improvement of power supply arrangement in Sambalpur division | Executed a complete 11 kV substation and overhead distribution infrastructure package including transformers, HT/LT panels, AB switches, cable networks, structural works, and safety systems. The project covered supply, erection, testing, and commissioning of high-capacity power distribution assets for reliable and standards-compliant railway power infrastructure. | Sambalpur, Odisha | Completed |
Provision of 33 KV underground cable against infringement due to the work of Electrification of unwired loop lines & yards in connection with mission 100% electrification of Indian Railway at Bondamunda yard | Comprehensive 33kV HT cable and overhead line infrastructure including XLPE termination systems, gantry structures, micro-drilled crossings, apparatus installations, and advanced cable fault diagnostic equipment. The project integrated supply, erection, dismantling, structural works, and protection-grade earthing under railway-compliant standards. | Rourkela, Odisha | Completed |